Concrete Weigh Bridge

Overview


Looking for immense load bearing strength with minimum of maintenance! Then a Concrete weighbridge deck is the ideal choice. Our concrete decks enable throughputs of bulk materials and are designed to keep installation, maintenance and operation as simple as possible even in the saline and corrosive environment.

We can produce up to 150 Truck Scales per month.

Essae Concrete Truck Scales are available in capacities ranging from 10 - 150 ton and platform sizes of 2m x 2m to 25m x 6m.

You can choose either a Surface Mounted or a Pit Mounted Concrete Scale depending on the space availability. The Steel Frame for the concrete scale is designed to withstand harsh environmental conditions.

Latest machines are deployed to ensure that quality is built into the manufacturing process. The production system ensures impeccable focus to the performance of the product and faster response to customer's needs. With over 4000 installations across the country we can provide expert advice on the optimum type of weighbridge to suit your site conditions and meet your operational goals.

Features


  • Accurate weight first time & every time
  • Fast, economical installation
  • Excellent levels of corrosion protection through shot-blasting and epoxy paint Coating
  • Factory build and calibrated with stringent quality standards
  • Use of superior quality steel ensures better sectional efficiency and load bearing capacity
  • Use of Plasma Cutting, MIG Welding, NDT Testing, Shot Blasting, Protective Coating, Epoxy Finishing help in creating quality weighbridges every time.
  • The calibration and testing for each system is carried out prior to delivery.

Models with features


Pit Weighbridge



  • Less space consumption
  • Level with pavement
  • Easy access to weighbridge
  • Easy access to weighbridge components


Platform size - 7.5m x 3m
Capacity — 40 tons, 50 tons 40 tons, 50 tons


TATA:

407/27, 407/31, SFC 609, SE 1510/32, Se1510A/32, LPT 1510/31, LPT 1510A/32, SK1612/32, L1210D/32 Haulage


ASHOK LEYLAND:

CARGO 2614, CARGO 7512, CARGO 709, COMET AL-CO 3/3 Tripper, COMET AL-CO 3/4 Tripper


Platform size -12m x 3m Capacity - 50 tons, 60 tons, 100 tons


VOLVO:

All FM & FH series


Mercedes:

ACTROS 4841K


Others:

LPS1616/32 +CC-2-20
LPS 1616/32 + TC-1-10
LPS 1616/32 + VTT-2-30
LPS1616/32 + TSS-2-10
LPS 1616/32 + TC-1-20
LPS 1616/32 + TSS-2-10

Pitless Weighbridge



  • Less Civil Expense
  • Visibility of Weighbridge
  • No water clogging problem
  • Easy maintenance




Platform size - 9m x 3m Capacity - 40 tons, 50 tons, 60 tons 40 tons, 50 tons, 60 tons


TATA:

LPT 1510/36 & LPT 1510A/36, LPT 1510/42 & LPT 1510A/42, LPT 1510/48 & LPT 1510A/48, SE 1510/36 & SE 1510A/36, SE 1510/42 & SE 1510A/42, SE 1510/48 & SE 1510A/48, LPT 1612/42, LPT 1612/48, LPT 2213 & LPT 2416, LPT 1613, LPT 709/34 & LPT 709/38, L1210D/36 & L1210D/42 Haulage



ASHOK LEYLAND:

TUSKER 13C 47, CARGO 75.12, CARGO 1614 & CARGO 909, COMET 1611, AL-CO 3/1 & 3/2 Haulage, BEAVER AL-B 1/1 Haulage, HIPPO AL-H 1/4 Tractor



Others

SK 1612/36, LPS 1616/32 + STP-2-35





Platform size -15m x 3m Capacity - 50 tons, 60 tons, 100 tons, 120 tons


VOLVO:

All FM & FH series



Mercedes:

ACTROS 4841K



Others:

LPS1616/32 + LB-1-25
LPS 1616/32 + FB-1-20
LPS 1616/32 + LB-1-20
LPS 1616/32 + FB-1-10
LPS 1616/32 + TSS-3-40
LPS 1616/32 + SSFR-2-50
LPS 1616/32 + TSS-3-30
LPS 1616/32 + LPS 1616/32 + STN-2-40





Platform size -18m x 3m Capacity - 60 tons, 100 tons, 120 tons, 150tons 60 tons, 100 tons, 120 tons, 150tons


VOLVO:

All FM & FH series



Mercedes:

ACTROS 4841K



Others:

LPS1616/32 +SSF-2-40
LPS 1616/32 +SSFR-2-60
LPS 1616/32 +STN-2-25
LPS 1616/32 + FB-2-40
LPS 1616/32 +CC-2-40
LPS 1616/32 +FB-2-25
LPS1616/32 + TSS-2-20
LPS 1616/32 + TU-4-40
LPS 1616/32 + STP-2-35
LPS 1616/32 + SSF-2-25
LPS 1616/32 + TU-4-30
LPS 1616/32 + DDF-2-20



Download Brochure



Construction Process of Concrete Weighbridge



1. Civil Construction


2. Assembly of Beams


3. Wielding of Base Sheets


4. Laying of Re-enforcement


5. Concrete Pouring & Leveling


6. Installing the Load cells